$\begingroup$

So say I am testing the predictive value of a predictor towards a "DV" within a survey data-set, between two time-points. Say also that I have measurements of both variables at all time points and that I can see that the DV and the predictor correlate at baseline. If I use linear regression or pearson correlation to evaluate the associaton between the predictor at baseline and the DV at a later time-point, do I need to correct for the correlation at baseline? I figure that if I do not correct, somehow, for this initial correlation I am not only testing prediction of the DV but also the test-retest-reliability of the predictor. Hope I am making sense.

$\endgroup$
  • 2
    $\begingroup$ I've started some discussion in the chat room about making appropriate tags for such questions. I provide a useful set of related questions in there you might be interested in (there are a handful of related questions and references you might be interested in). In particular I would recommend viewing the answers to Best practice when analysing pre-post treatment-control designs. $\endgroup$ – Andy W Sep 3 '12 at 18:17
  • $\begingroup$ Well, there's no real control-group in my example, but maybe the information in your link still applies if I only understand it well enough? $\endgroup$ – Missing Bob Sep 3 '12 at 18:45
3
$\begingroup$

There are two general ways to do this. Method 1 is to use the baseline measurement as a covariate in a linear model, as in

$\small measurement_2 = B_1 * measurement_1 + B_0$

Method 2 is to use the difference score as the dependent variable in an intercept-only linear model, as in

$\small measurement_2 - measurement_1 = B_0$

Method 1 is generally more powerful than method 2. You can see this by realizing that you can derive method 2 from method 1 by adding measurement1 to both sides of the equation, as in:

$\small measurement_2 - measurement_1 (+ measurement_1) = (measurement_1) + B_0$

Effectively, method 2 assumes that the coefficient ($\small B_1$) of $\small measurement_1$ is equal to 1. Because, by definition, linear regression finds the linear combination of coefficients that minimizes error, method 1 must of necessity be more powerful than method 2. However, there are some instances where you might want to use method 2, particularly when, for example, you have a second variable (say a dichotomous variable, such as a randomized intervention) on which there are pretest differences on your variable of interest. In this special case, method 1 will yield biased results for the test of the effect of the intervention, whereas method 2 will be unbiased.

See Van Breukelen (2006) for more details.

| cite | improve this answer | |
$\endgroup$

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service, privacy policy and cookie policy

Not the answer you're looking for? Browse other questions tagged or ask your own question.