Timeline for Average run length
Current License: CC BY-SA 3.0
2 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
May 28, 2015 at 13:42 | comment | added | whuber♦ | I believe this answer reflects an irrelevant interpretation of "run length." For control charts, the ARL is the expected number of points observed before an out-of-control signal is emitted. See the Wikipedia article, for instance. | |
Jun 30, 2014 at 14:03 | history | answered | Placidia | CC BY-SA 3.0 |