Timeline for Modeling a spline over time -- design matrix and survey of approaches
Current License: CC BY-SA 3.0
10 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Nov 8, 2017 at 0:44 | history | bumped | CommunityBot | This question has answers that may be good or bad; the system has marked it active so that they can be reviewed. | |
Oct 7, 2017 at 13:34 | answer | added | Benjamin Christoffersen | timeline score: 1 | |
Apr 20, 2016 at 11:36 | comment | added | nukimov | Data from time series are never independent data, since the evolution in time correlates the observations of the same time series (time auto-correlation), unless, of course, you are dealing with noise. But this time correlation has nothing to do with the 2 time series being independent from each other. The time is the same for x1 and x2, so the ith score or entry of the variable x1 should be in the same row of the model matrix than the ith score of the variable x2. I do not see why this violates the assumption that the time series are independent. If in doubt, calculate the cross-correlation. | |
Aug 10, 2012 at 2:09 | history | tweeted | twitter.com/#!/StackStats/status/233746977228222464 | ||
Aug 7, 2012 at 19:42 | history | edited | tsawallis | CC BY-SA 3.0 |
edited an error in the code comments.
|
Aug 7, 2012 at 18:11 | history | edited | tsawallis | CC BY-SA 3.0 |
grammar fix.
|
Aug 7, 2012 at 18:08 | history | edited | gung - Reinstate Monica | CC BY-SA 3.0 |
fixed images
|
Aug 7, 2012 at 18:00 | history | edited | tsawallis | CC BY-SA 3.0 |
added 41 characters in body
|
Aug 7, 2012 at 17:50 | history | edited | gung - Reinstate Monica | CC BY-SA 3.0 |
light editing & formatting; uploaded figures
|
Aug 7, 2012 at 16:53 | history | asked | tsawallis | CC BY-SA 3.0 |