Skip to main content
3 events
when toggle format what by license comment
Mar 15, 2023 at 15:01 comment added Walter great! however, I do see that you have only 28 subjects. This might be a bit low, so be carefull and check the SD of the varaibles after adding an interaction. The model will look something like LMM.results <- Lmer(result~ TimePoint +variable + TimePoint*variable (1|ID), dataset)
Mar 14, 2023 at 18:14 comment added John Conor They are evenly spaced, at each time point both variables are collected in paralell. They are both continusos variables. Yes, that's what I'm thinking. I'm just struggling to find a similar example. I'm doing everything in R.
Mar 14, 2023 at 18:00 history answered Walter CC BY-SA 4.0