Timeline for How to select predictors in regression using backward method?
Current License: CC BY-SA 3.0
3 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
May 20, 2014 at 10:07 | comment | added | Peter Flom | Backward estimation is rarely a good idea, nor are forward or stepwise. See e.g. Harrell Regression Modeling Strategies. Is your sample size 68 or 259? | |
May 20, 2014 at 6:49 | comment | added | June | They are not entirely based on theory. These predictors have not been tested before and the dependent variabele is new as well. The predictors are variables I suggest that will have an effect. I chose one predictor that came from literature. The sample size for the particular question of the dependent variable is 68 (entire sample size is 259). The correlations between variables exists but it not higher than ,500. Is it ok to use the backward-method in this case? | |
May 19, 2014 at 22:33 | history | answered | Peter Flom | CC BY-SA 3.0 |