8
$\begingroup$

This question is similar to the one posed here: Testing significance of peaks in spectral density

In that post, Pantera asks how to test whether a peak in a periodogram has a spike that is significantly different from the spikes generated by noise.

My question is this, when using the spec.pgram() function in R, a confidence interval is calculated and plotted as a blue line -- what is the correct interpretation of this interval, and how can we extract what its numerical values are?

I've seen it suggested that to find an answer to this question, we should inspect the code for the plot.spec() function and then observe the spec.ci() function code, and figure things out from there.

spec.ci <- function(spec.obj, coverage = 0.95) {
      if (coverage < 0 || coverage >= 1) 
          stop("coverage probability out of range [0,1)")
      tail <- (1 - coverage)
      df <- spec.obj$df
      upper.quantile <- 1 - tail * pchisq(df, df, lower.tail = FALSE)
      lower.quantile <- tail * pchisq(df, df)
      1/(qchisq(c(upper.quantile, lower.quantile), df)/df)
  }

Plot generated by specpgram

I suspect that the height of the CI is some indication of the amplitude for which 95% of the data are less than. But what is the "baseline" for that? Would it be possible to calculate and add horizontal lines to the plot indicating which peaks are significant? Any help would be greatly appreciated. For context, I am a biologist and these data are from imaging of rhythmic behavior in insects.

$\endgroup$
4
  • $\begingroup$ I think your question is still of great interest. Is there any "out there" who could answer it? The question: "My question is this, when using the spec.pgram() function in R, a confidence interval is calculated and plotted as a blue line -- what is the correct interpretation of this interval, and how can we extract what its numerical values are?" $\endgroup$
    – Pantera
    Commented Jan 18, 2013 at 14:41
  • $\begingroup$ I'm not sure about the implementation there, but for general discussion of significance testing with periodograms, see: stats.stackexchange.com/questions/12164/… $\endgroup$ Commented Nov 7, 2016 at 13:36
  • $\begingroup$ When I tried inspecting the code (by directly typing the function names), I cannot see plot.spec() and spec.ci() as you claimed. Could you please let me know how did you retrieve them? $\endgroup$
    – Zhanxiong
    Commented Dec 3, 2020 at 21:39
  • $\begingroup$ OK, I got it. I should use getAnywhere(plot.spec). I will study the source code and try to post an answer shortly. $\endgroup$
    – Zhanxiong
    Commented Dec 3, 2020 at 21:55

1 Answer 1

1
$\begingroup$

You are on the right track by inspecting the source code. In addition to the spec.ci function you found, the plotting chunk for CI is given by

ci.text <- ""
conf.y <- max(x$spec)/conf.lim[2L]
conf.x <- max(x$freq) - x$bandwidth
lines(rep(conf.x, 2), conf.y * conf.lim, col = ci.col)
lines(conf.x + c(-0.5, 0.5) * x$bandwidth, rep(conf.y, 2), col = ci.col)

Therefore the confidence interval is about a single parameter $f(\omega)$ with $\omega$ taken to be at the fixed frequency conf.x. The confidence interval formula for a given frequency $\omega$, is (see Eq. (10.5.2) of Brockwell & Davis Time Series: Theory and Methods): \begin{align*} \left(\frac{\nu \hat{f}(\omega)}{\chi_{1 - \alpha/2}^2(\nu)}, \frac{\nu \hat{f}(\omega)}{\chi_{\alpha/2}^2(\nu)}\right), \quad 0 < \omega < \pi, \end{align*} where $\nu$ is the equivalent degrees of freedom of the estimator $\hat{f}$, which corresponds to df in the code you pasted in the question.

$\endgroup$